Arlington 2007 ( Saturday )
Edit: Since the first posting of these photos, I became unhappy with the color balance of a few of these "prints". Since then many of these have been readjusted to my liking.
If you want any of these photos in a size larger than 1600x1200, just drop me a line.
Sunday, July 15, 2007
Sunday, July 08, 2007

On Saturday was spent about two hours deburring, chromating, and riveting the bottom skins and spars together.
A new hand riveter had just arrived from Zenith which made the flaperon brackets much easier.
On Sunday we had a nice day at Friday Harbor.
Project Status:
Wings: ~114h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h, 2h, 1h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~215.5
Wednesday, July 04, 2007
Tuesday night we spent about an hour finishing the drilling into the spar on both sides. The bottom is drilled out to A4, and is partially deburred. Wednesday we should finish the deburring, corrosion protecting, and get the bottom skins riveted on.
My inspection plates arrived today, so I may install those as well.
Project Status:
Wings: ~112h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h, 2h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~213.5
My inspection plates arrived today, so I may install those as well.
Project Status:
Wings: ~112h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h, 2h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~213.5
Tuesday, July 03, 2007
Monday night I got the nose skin drilled on the wing. I also finished the pilot holes from the nose skin into the top part of the spar.The kit that Zenith provides has the front edge of the top skin predrilled, but not the nose skin. This is a problem since the nose skin overlaps on top of the top skin. The get around this before placing the nose skin, the top skin had several holes drilled into it into the spar which were marked with a sharpie on the skin.
When the nose skin was ratcheted on, I slipped it underneath the top skin and drilled those few holes using the lowest speed of my drill so I could find the matching spar hole beneath it.
Once those holes were clecoed, I then drilled lightly through the skin, trying not to enter the spar.
Once all the holes were matched, I slipped the nose skin over top the top skin, clecoed through the skin into the few holes that were in the spar, and then drilled through the remaining matched holes into the spar.
To help move the nose ribs into place, I made a hook out of some PVC that was laying around.
A few days ago I ordered my fuselage kit along with the bubble door option. I also ordered Jon "Crash" Croke's fuselage construction DVDs. I'll have a review up in the next week or so.
Also on it way are inspection plates and my lighting system. I decided on going with a ready solution since I would still have to match a driver unit and get the lenses.
Here is the Wick's page on the GS LED unit I will use: http://www.wicksaircraft.com/catalog/product_cat.php/subid=7000/index.html
Project Status:
Wings: ~111h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~212.5
Monday, July 02, 2007
Tuesday, June 26, 2007
It took about two hours to get the skins back on, clecoed into place, get the nose skin on and drill the bottom of the nose ribs.On this wing the bottom spar has not been drilled yet, spare about a dozen holes ( A3 ) to keep everything from beer canning.
This will add the extra steps of having to take the skins off again... and put them back on again before riveting, but should make for a better fit.
Project Status:
Wings: ~109h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~210.5
Sunday, June 24, 2007
Look Mom, no clecos! We spent about three hours on Sunday finishing some deburring, corrosion protecting, and riveting.About mid afternoon, about 15 minutes after hauling the bottom wing skins, spar, and a few other pieces out... and spraying them... the skies opened up with a freak rain storm. All the pieces were quickly taken back into the garage and dried off.
A good bit of time was spent using the lessons learned from the other wing and attempting to get the rivet order correct. The brackets on the fuel tank channel and rear channels were done first, followed by the flaperon brackets to the ribs, followed by the ribs into the spar.
The rear channel needs to be done in a specific order: work from inboard to out board leaving the outboard side of the channel being riveted unclecoed so the channel can be pushed for clearance of the gun head. Since it is easily accessible, the root rib should be riveted last to the wing channel.
Project Status:
Wings: ~107h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~208.5
Thursday, June 21, 2007
Tuesday, June 19, 2007
EAA 1440 met tonight with a talk by Precision Airmotive. Honestly it was more info about carbs and fuel injection that I hopefully will ever need to know.
Due to the meeting, I only spent about an hour actually working on the plane. All wing parts ( except for the spar and skins ) were corrosion protected. The rest of the time was spent watching paint dry.
All the wing ribs, brackets and channels amazingly fit into a produce delivery box.
Project Status:
Wings: ~104h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~205.5
Due to the meeting, I only spent about an hour actually working on the plane. All wing parts ( except for the spar and skins ) were corrosion protected. The rest of the time was spent watching paint dry.
All the wing ribs, brackets and channels amazingly fit into a produce delivery box.
Project Status:
Wings: ~104h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~205.5
Monday, June 18, 2007
We spent another two hours deburring. The skins still need attention, and everything still needs Zinc Chromate.
Project Status:
Wings: ~103h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~204.5
Project Status:
Wings: ~103h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~204.5
Sunday, June 17, 2007
We spent about three hours finding more holes that needed to be enlarged to A5 or A4 while starting the deburring and disassembly of the left wing.
There was a light drizzle today so none of the parts were corrosion protected.
The garage needs to be rearranged so the left wing can be hung as well, so the shelves will have to be moved with perhaps some more storage.
Project Status:
Wings: ~101h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~124.5 hours
There was a light drizzle today so none of the parts were corrosion protected.
The garage needs to be rearranged so the left wing can be hung as well, so the shelves will have to be moved with perhaps some more storage.
Project Status:
Wings: ~101h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~124.5 hours
We spent two hours on the project and made great progress. The jury strut supports are now in and all of the skeleton has been drilled to the proper hole size. The skeleton is now ready for deburring and can be riveted along with the bottom skin.
We also crossed over the 200 hour mark of the project.
Project Status:
Wings: ~98h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~202.5 hours
We also crossed over the 200 hour mark of the project.
Project Status:
Wings: ~98h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~202.5 hours
Thursday, June 14, 2007
We spent an hour first cutting the the 8 pieces of L angle, then positioning the flaperon arms with the template, then verifying the position of the arms with string..... then drilling the arms into place.With this wing the flaperon arms were more forward on the brackets, so I drilled an additional hole into the arms to compensate for the holes I did not feel to have adequate edge distance.
Project Status:
Wings: ~96h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~199.5 hours
Wednesday, June 13, 2007
It took about two hours to get the strut angle in place and drilled. The strut attach point is also now pilot drilled to the support. Most of the time was spent waiting for the compressor since the right angle attachment wastes a large amount of energy and drilling out various holes to A4 so A3 clecos could be reclaimed.I think I have my lights picked out. A set of LEDs offered by Wicks. LED lighting is one of those "must haves" given the limited output of the Rotax alternator and the expected draw from the Dynon and radios.
Project Status:
Wings: ~95h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~198.5 hours
Monday, June 11, 2007
We were camping all weekend, so Friday night was all we got in until today ( Monday ). Two hours were spent getting the bottom edge of the front nose skin in. I had only drilled a few holes in the spar from the bottom skin, so it was easy to get the entire skin lined up. The strut support hole had to be enlarged on the inboard side exactly like on the other wing, but this time I bolted on the strut attachment with the skin off, saving time and frustration.
The strut angle is marked and ready to be drilled. The only issue is that we are running low on silver clecos ( AGAIN!?!?!?!? ), so more A3s had to be enlarged to A4s. This helped eliminate some of the ( very limited ) beer canning anyway.
And now for some purty pictures:
Project Status:
Wings: ~93h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~196.5 hours
The strut angle is marked and ready to be drilled. The only issue is that we are running low on silver clecos ( AGAIN!?!?!?!? ), so more A3s had to be enlarged to A4s. This helped eliminate some of the ( very limited ) beer canning anyway.
And now for some purty pictures:
Project Status:
Wings: ~93h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~196.5 hours
Friday, June 08, 2007
I finally found some energy to get back into the garage. It took about two hours to get the rear bottom skins drilled into place. The biggest time sinks were having to cleco myself and reclaiming silver clecos. It is hard to imagine that we are low on A3 clecos again, but we are. To get clecos back I drilled some holes out to A4s.When you are placing your holes for the outboard side of the flaperon brackets the manual states that the hole is 10mm from the bracket, but there is a better way of finding the hole. Simply extend your rivet line from the ribs down to the rear channel. Drill where the two lines intersect.
Project Status:
Wings: ~91h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~194.5 hours
Monday, May 28, 2007
I spent about two hours on Sunday getting the trailing edge skins ready on the right wing. They are all ready to be drilled.
This week will be light on the building. More to follow.
Project Status:
Wings: ~89h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~192.5 hours
This week will be light on the building. More to follow.
Project Status:
Wings: ~89h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~192.5 hours
Friday, May 25, 2007
Friday we spent about four hours getting both the top and bottom skins into place and drilled. I learned my lesson this time and only drilled a few holes into the spar on the top skin. The bottom skin also only has a few holes drilled into the spar, although it did not cause any problems last time.
The left wing went much faster and we had a much easier time getting the flange lines into place.
Thursday I did another cross country in a Super Cub, this time to Whatcom lake and Lake Cavanaugh near the Canadian border.
Project Status:
Wings: ~87h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~190.5 hours
Tuesday, May 22, 2007
I once again spent my afternoon in a Super Cub... with an 84" prop.
We had lunch at Lake Wynooche in the Olympic Mountains while talking shop in a way that satisfied my BFR.
Is there a better way of spending the day?
In project news I have the nose skin now in place. Only a few of the holes for the slat support and the spar extension need to be placed.
Those fuel tanks are just around the corner!
We had lunch at Lake Wynooche in the Olympic Mountains while talking shop in a way that satisfied my BFR.
Is there a better way of spending the day?
In project news I have the nose skin now in place. Only a few of the holes for the slat support and the spar extension need to be placed.
Those fuel tanks are just around the corner!
Later in the afternoon I made a trip to Home Depot for new straps. I placed some wood up against the flaperon brackets to protect the trailing edge and everything worked well. I slipped the nose skin underneath the top skin and have had good success with the existing spar holes. I am simply using low speed on the drill and stopping as soon as I feel the nose skin being penetrated. I then inserted a cleco and searched for the existing spar hole.
My after noon was spent with a Cub Crafters Top Cub on the Snohomish River. Today I have a couple of hours and am going to take care of that pesky BFR.
Step Taxi near the 522 bridge
Taking off
Project Status:
Wings: ~82h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~185.5 hours
Monday, May 21, 2007
It took four hours to rivet the remaining skeleton and bottom skin. A few A4s were accidentally put where A5s should go, so I had to drill those out.
Currently the nose skin is clecoed to the skeleton. Strapping the nose skin is always the hardest part. To complicate matters I already drilled through the pre-drilled top skin into the rib. To work around this I will drill the skin to the nose ribs first THEN slip the nose skin under the top skin, then mark where a few holes are supposed to go. I will then slip out the skin, drill those few marked holes with an A4 bit, slip the skin back under and cleco the top skin back onto the spar through those holes. Once that is done all the holes on the top skin should align with the existing holes in the spar and the nose skin can be pilot drilled. Once the nose skin is pilot drilled, I will then slip the skin out and place the nose skin over top the top skin. To help I used the edge distance tool to mark where the nose skin should reach.
Project Status:
Wings: ~80h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~183.5 hours
Friday, May 18, 2007
It took three hours to put the wing skeleton back together and rivet the rear channel and the fuel tank channel.
Part of the time was spent drilling out rivets due to some thoughtlessness on the rivet order. Here is what I learned:
- Rivet the rear channel and their angles first.
- Rivet the (L) angle to the fuel tank channel second.
- Rivet the Fuel tank channel to the ribs before riveting the rear wing channels to the ribs. This allows easier access on the inboard side with a pneumatic gun.
- Rivet the flaperon support brackets before riveting the wing channels.
- With the wing right side up, rivet the rear channel to the ribs from the outboard working your way inboard. Have the inboard piece of the channel you are riveting disconnected so you can push the nose of the gun inside. Use a hand riveter with a swivel head to get the heavy channel that has the strut support.
- Have someone else help you so you don't have to put down the rivet gun!
Project Status:
Wings: ~75h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~178.5 hours
Tuesday, May 08, 2007
Seven hours of deburring, disassembly and chromating. The wing is still in pieces. Lets hope I can put it back together again when I return from vacation.
In other news I splurged and flew a Cirrus for the first time. One point seven in an SR-20.
Project Status:
Wings: ~72h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~175.5 hours
In other news I splurged and flew a Cirrus for the first time. One point seven in an SR-20.
Project Status:
Wings: ~72h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~175.5 hours
Sunday, May 06, 2007
Saturday night we spent about 3 hours. I went back and drilled out all the A3 holes on the skeleton to A4s and A5s. There are still a few places that need to be enlarged but the skin must be removed to reach those ( all on the rear channel ).
It took a long time to change to color of the skin clecos. Only the bottom skin was drilled out, but it was a long process. We also cleaned the garage out.
Project Status:
Wings: ~65h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~168.5 hours
Monday, April 30, 2007
On Saturday we got the forward strut attach point bolted along with all the other related pieces drilled into place. Tightening the bolt closest to the skin is a major pain. Maybe some sort of inspection port nearby would be a benefit.
Sunday I fabricated the flaperon positioning template and got the flaperon arms into place. I found a good way to check if the holes are co-linear. Just use a spool of thread. Have one person hold the thread tight on one end, and then hold it tight on the other. If the holes are not co-linear then the thread will indicate which way the bracket needs to be moved.
I bought a right angle adapter from Home Depot a while ago, and it came in handy. The builders manual shows a nice way of not damaging the skin when using the drill in tight spots... a nice tip to have had earlier. My variation used an extra piece of heavy wing channel that had to be trimmed off. Since the wing channel is bent on both sides, the chuck can not move the protecting piece out of the way.
There is an optional step to place the tie down rings. I do not remember receiving the tie down brackets, although I could fabricate my own. The position of the brackets confuses me. It seems that attaching the bracket to the fifth rib is not the strongest place. Why is the loop not attached to the strut support? The strut support already is attached to the spar which would be a better place in case of a wind storm around here.
Project Status:
Wings: 60h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~163.5 hours
Monday, April 23, 2007
The manual shows how to cut the flaperon hinge slots into the rear skins with a drill. I tried to do that for a few holes and ended up wandering with the bit too much. A much better approach is to use a reinforced cutting blade on a Dremel.
Thursday we got a package of 200 silver clecos from Wicks... which is possibly too many clecos.
I freshened up on my float skills today with splash downs in Lake Washington and the Snohomish river. Drivers on the 522 bridge got a show as we approached down into the river and passed overhead by less than 50 feet. Then some fishermen got a show as we flew along the river about 10 feet off the deck making tight turns to follow the river bed. I could make out details on one of their faces....
Project Status:
Wings: 53h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~156.5 hours
Tuesday, April 17, 2007
Monday I got a little time in to start trimming and placing the rear right trailing edge wing skins. While the plans normally show the right side of an object, the skins are sometimes shown as they appear on the left side. Take note and be careful.
EAA is tonight, so probably no building will happen. I expect Wednesday, Thursday and Friday to be a full on spree!
Project Status:
Wings: 53h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~153.5 hours
EAA is tonight, so probably no building will happen. I expect Wednesday, Thursday and Friday to be a full on spree!
Project Status:
Wings: 53h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~153.5 hours
Monday, April 16, 2007
We found some time over the week and on Sunday to align the spar and support the trailing edge in such a way to ensure no twist. The bottom skin was pre-drilled and fit over the skeleton fairly well. Since there is a bit of a curvature to the bottom of the wing ribs we ended up using some duct tape to help hold the skin towards the trailing edge to help keep the skin from beer canning. Over all this was the easiest skin to apply yet.
Project Status:
Wings: 52h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~152.5 hours
Sunday, April 08, 2007
Friday, April 06, 2007
We ended up having to remove several of the small shims securing the ribs since they interfered with moving the skeleton to match the pre-drilled holes on the skin. Using several rafter squares clamped to the rib and spar worked wonderfully.
Thursday saw a good two hours of drilling the top, rear starboard wing skin into it's respective skeleton. This would not have been possible without the generous lending of clecos to me.
The electric drill did a much better job of drilling into the spar, while the air drill was faster drilling into the ribs.
Hopefully I can get up to Wicks on Saturday and buy another two hundred clecos or so. I'm also low on zinc chromate.
I also got to see one of the many RV-7 projects our chapter has. Van's is really onto something with matched-pair drilling. If the RV-12 kit has the same amount of pre-drilling on the skins AND the ribs, then the 601 will have some real competition in the LSA area.
Project Status:
Wings: 49h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~149.5 hours
Thursday, March 29, 2007
I have a bunch of photos to upload, but my home computer has been overheating, and it is low on the "fix list'.
Recently I got the tank channels into place, drilled and clecoed along with all the prep work to get the right wing ready for the top rear skin.
Project Status:
Wings: 45.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~147 hours
Thursday, March 22, 2007
Wednesday I spend a few minutes making the jig for the fuel tank channel, and almost an hour cleaning up my workshop.
Monday some jerk broke into my Jeep at about 9:15AM, right before I normally leave for work, and stole my Garmin 496.
Sunday I finally flew a CH-701, albeit only for a little while and from the right seat. It gave me some renewed vigor to finish the project.
Project Status:
Wings: 44h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~145.5 hours
Monday some jerk broke into my Jeep at about 9:15AM, right before I normally leave for work, and stole my Garmin 496.
Sunday I finally flew a CH-701, albeit only for a little while and from the right seat. It gave me some renewed vigor to finish the project.
Project Status:
Wings: 44h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~145.5 hours
Saturday, March 17, 2007
More visitors came through the garage. This time a couple interested in building, but also on their way to visit a Czech 701 to potentially buy.
Sunday will hopefully bring high ceilings and actual time in the cockpit.
Project Status:
Wings: 43.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~145 hours
Tuesday, March 13, 2007
Some "L" angle was also cut and drilled that acts as a brace.
It has taken some time for me to realize this, but the drawing for a piece like 7V4-4 will be found on page 7-V-4. I was trying to determine the dimensions of the piece from the drawing of 7V4-4 that was on 7-V-5.
Right now my plan is to work only on the right wing for the moment since space is now at a premium. Once the right wing is finished, it will be hung on the wall and the left wing will be finished.
Project Status:
Wings: 40.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~143 hours
Monday, March 12, 2007
Already got a response!
Caleb got back to me with Zenith's uncanny quickness. The problem was me.
I already used these ( better ) directions and the piece looks like that in the manual. Tonight I'll cut it.
Caleb got back to me with Zenith's uncanny quickness. The problem was me.
... I would suggest removing all the lines you have marked and starting over. Go to page 7-V-4 in your drawings, at the bottom is the part geometry and dimensions. I would start at the smaller end, draw a line at 16mm from the end, this is the line that the bolt hole is on. From the line you just made, mark a line at 115mm. Measuring from the edge that is 90 degrees to the larger end, measure along the second line you made and mark a point at 27mm. Then from the second line you made measure back towards the smaller end 15mm, make a point on the bottom. Draw a straight line between the bottom point and the point you made at 27mm. Now at the top of the part from the second line you made measure back towards the smaller end 41mm, make a point there and connect that point and the point at 27mm. All of the dimensions and part geometries are in your drawings.
Sunday, March 11, 2007
We spent about two hours. The first hour and a half was spent figuring out the best way to get the flaperon brackets consistently placed. The end result was using some extrusion clamped to the top of the rib, then using some "L" angle to hold the bracket to the rib. The ends of the brackets were all made flush with the end of the rib.
I'm not sure how I got into this position in the first place. I drew out the rivet lines on the spar and channel, and the pre-drilled holes of the skin line up perfectly.
But as always, progress must be stopped. I believe that the 7V7-4 supplied with my wing kit may be mal-formed.
Basically making a mark 41mm from the 115mm mark to the right is past the piece. Making the 41mm mark to the left doesn't look right
The instructions in the manual are somewhat confusing, so I would be happy to find out I mis-interpreted them.
Wings: 38.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~141 hours
Wednesday, February 28, 2007
Wednesday, February 21, 2007

EAA 1440 had another meeting last night, with a great analysis of accident rates and causes for homebuilts, along with comparisons to the production fleet.
I've had this idea of formalizing risk mitigations knocking around in my head for a while. At Microsoft an employee determines a set of commitments and accountabilities for those commitments, which determine the results of the annual performance review.
This model seems like a good fit for something like the homebuilding process. Considering that the fleet accident rate for all Zeniths is about 2.14% ( higher than Lancairs, less than Seareys ), then I need to do something to minimize my individual exposure to risks.
At the moment I have no idea what the largest contributor is to the Zenith fleet accident, my commitments will be based on my perceived cause of accidents and the root causes of the overall homebuilt fleet.
Commitment: Flight training
Execution:
- Meet with our EAA flight advisor. Meet with an EAA flight advisor who has specific experience with the CH701.
- Obtain an additional 20 hours of float training. Attempt to find a reasonable source of amphibious training.
- Attempt to find a source of CH701 specific training.
Execution:
- Hold a project open house before transport for final assembly
- Meet with an EAA technical advisor, with a review of all airframe, fuel line, and FWF assemblies.
- Have a trusted A&P do a review of the airframe assembly
- Perform a full inspection at the following intervals of flight time:
- 1, 5, 10, 20, 40, 60, 100
- Have a trusted A&P do the annual condition inspection with me so I can learn how to maintain the aircraft.
Execution:
- Obtain help with the FWF installation by an experienced Rotax installer
Execution:
- Determine more commitments that are relevant for a safe completion of the project.
Sunday, February 18, 2007
I believe that my rear wing channels may be a few mm aft, as I am having a problem with 7V4-6.
When I attempt to place the bracket, the after edge is more rearward than the rib. If I move the bracket forward then it gets between the rib and the channel.
Is the correction to attempt to move the channel forward, or to shim between the rib and the channel?
Project Status:
Wings: 36.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~139 hours
Saturday night we were able to sneak in about an hour and a half of work. Tasks completed included cutting the outboard rear wing channel for the wing tips, discovering that the inboard heavy duty rear wing channel required trimming, trimming them, figuring out the measurements and hole placements for the 7V4-3 ( doubler ) and then pre-drilling it.
Luckily all the trimming produced enough scrap to fill in for some 7V6-3. I found Zenith really does not provide enough of that piece. I can't imagine that it cost's that much, or would be too difficult to produce.
Project Status:
Wings: 34.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~137 hours
Luckily all the trimming produced enough scrap to fill in for some 7V6-3. I found Zenith really does not provide enough of that piece. I can't imagine that it cost's that much, or would be too difficult to produce.
Project Status:
Wings: 34.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~137 hours
Wednesday, February 14, 2007
Building will be slow for the next several weeks...
Superbowl Sunday was productive and most of the rear wing channel for the left wing was finished. The remaining center piece was done on Monday.
Working on the rear channels alone is a challenge, an assistant is a necessity.
After much discussion on the Zenith list, I bought and tried a Drill Doctor XP2. What a piece of crap. I tried two #30 bits that we past their life and it made . A #40 was also tried and destroyed. If I hadn't received a refund from Home Depot you can bet that angry mails would be sent, but I really don't have the time. All three bits were made blunt, not matter what I attempted.
Project Status:
Wings: 33.0h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~135.5 hours
Superbowl Sunday was productive and most of the rear wing channel for the left wing was finished. The remaining center piece was done on Monday.
Working on the rear channels alone is a challenge, an assistant is a necessity.
After much discussion on the Zenith list, I bought and tried a Drill Doctor XP2. What a piece of crap. I tried two #30 bits that we past their life and it made . A #40 was also tried and destroyed. If I hadn't received a refund from Home Depot you can bet that angry mails would be sent, but I really don't have the time. All three bits were made blunt, not matter what I attempted.
Project Status:
Wings: 33.0h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~135.5 hours
Sunday, January 28, 2007
We only spent an hour on the left wing. The rear channel positioning template was used for the first half of the drilling. Attaching the inboard halves still needs to be done, and the rear channels do need to be trimmed to fit.
Project Status:
Wings: 30.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~133 hours
Project Status:
Wings: 30.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~133 hours
Sunday, January 21, 2007
Dave and Pat from EAA dropped by to see what a Zenith project is all about. They are about to embark on the journey with a 601XL.
The 60mm jig worked perfectly, and I did drill the channels into place from the middle of the spar outwards, but did the middle heavy channel last. I did have to trim the rib channel position template a small amount.
Everything seems to be square.
For the middle heavy channel, we used two bookshelf brackets ( as pictured ) to keep the ribs square as the rib angle and channel were squared into place. We had to mark the holes into the rib angle and then precision drill them since clamping would have been impossible.
The left wing's rear channel should not take near as long.
Saturday we actually flew the old 150 and saw the new Olympic Sculpture Garden from the air.
Project Status:
Wings: 29.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~133 hours
Friday, January 19, 2007
Finally got a little time to work on the project. Spent about and hour playing with the rear template placement jig and the rear channels.
When I had my last major question, I was trying to determine the jig distance for the rear channel ( 380 or 400mm ). I called Zenith and Roger gave me a better way: do not even use the jig. His suggestion was ( working center outwards ) to square the ribs, place the wing channels and THEN drill the angle to the channels.
Having already jigged the long sets, I decided to do this for the short channel.
Here is the problem: I first test fitted the 600mm channels and the angle ( 7V6-3 ) was not protruding far enough from the channel. The mating surfaces were about 3-4 mm apart. The obvious fix is to trim away a small portion of the flange from the wing rib. Because the piece must be 600mm for proper rib alignment, moving the 7V6-3 or the fabricated end cap are not options.
I'm still going to follow Roger's advice for the shorter channels since I can trim the entire channel for clearance before adding the 7V6-3 and still maintain proper edge distance.
Project Status:
Wings: 26.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~130 hours
When I had my last major question, I was trying to determine the jig distance for the rear channel ( 380 or 400mm ). I called Zenith and Roger gave me a better way: do not even use the jig. His suggestion was ( working center outwards ) to square the ribs, place the wing channels and THEN drill the angle to the channels.
Having already jigged the long sets, I decided to do this for the short channel.
Here is the problem: I first test fitted the 600mm channels and the angle ( 7V6-3 ) was not protruding far enough from the channel. The mating surfaces were about 3-4 mm apart. The obvious fix is to trim away a small portion of the flange from the wing rib. Because the piece must be 600mm for proper rib alignment, moving the 7V6-3 or the fabricated end cap are not options.
I'm still going to follow Roger's advice for the shorter channels since I can trim the entire channel for clearance before adding the 7V6-3 and still maintain proper edge distance.
Project Status:
Wings: 26.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~130 hours
Sunday, January 14, 2007
The manual gives a kernel of a good instruction, but there was an easier way. If you mark the edge distance and then mark your rivet holes on the outside of the channel, you can support the piece ( placed in the jig ) during drilling with a small piece of wood underneath it. When you back drill, use the same piece of wood with a clamp to keep parts from shifting.
The first jig was set to a length of 600mm for 7V6-2SP. The manual states that for 7V6-1 the jig should be set to 380mm, BUT the length of 7V6-1 is 380mm. The plans state that the flange-to-flange distance of the completed part is 400mm, so I think the manual is in error.
The Zenith list seems to concur, but I'm going to call Mexico, MO in the morning.
Also, Robert from my EAA chapter dropped by curious to see what the Zenith build process id like compared to the RV-7 he is working on.
Project Status:
Wings: 25.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~129 hours
We spent about two hours cutting the false rib template and making the first rear channel jig ( both shown in the photo ). Most of that was figuring out the fancy new tool. It even can with an instructional DVD.
The router also came in handy cleaning up the workbench edge that 1) wasn't cut very straight 2) has been drilled more than Paris Hilton.
Project Status:
Wings: 21.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~124 hours
Friday, January 12, 2007
This was an easy task, except on the plans many of the measurements are relative to each other, making some easy parts hard.
More tools are needed... like a router to do the tight spots. Should also come in handy for the slat jig.
Project Status:
Wings: 19.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~122 hours
Tuesday, January 09, 2007
On Monday we spent about an hour fabricating the bends in the rear channel for the right wing. Wood was used instead of a backing bar. I used a file to bevel of the edge for the radius to be about the correct size.
Project Status:
Wings: 18.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~121 hours
Project Status:
Wings: 18.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~121 hours
Saturday, January 06, 2007
We spent 4.5 hours fabricating the skin supports for the left wing, drilling the supports, mounts and tip ribs. Everything got deburred, protected and riveted. For both wings. It was a large amount of work for very little visual payoff.
The next mini-project is the rear wing channel. This will involve some templates and a simple jig.
Project Status:
Wings: 18.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5 )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~120 hours
Friday, January 05, 2007
The whole affair was straight forward, but I found it slightly difficult to drill the bend release holes. Getting a good angle to cut the L angle was also a little tricky.
Only the right side was fabricated so I could avoid any problems of mirrored parts getting mixed up.
Someone asked me if I worked on the project every night... and recently I have been. But there was a while when work prevented such progress. Even if I don't actually drill, cut, deburr or corrosion protect something, working at least every other night keeps the project in your mind and avoids having to REALLY spend some time reorienting yourself.
Project Status:
Wings: 14h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5 )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~115.5 hours
Thursday, January 04, 2007
What is a massive project that takes years to finish? An airplane yes, but also a video game. I am preparing for another crunch at the office, but you can see the fruits of my labor. If you have a Xbox 360 with a Xbox Live Gold account and a Xbox hard drive, then please sign up for the Shadowrun beta. http://shadowrun.com/behindthescenes/articles/BetaApplication.htm
Should you accept the offer from Mr. Johnson you will be given the chance to geek those dandelion eaters without having to pay any Nuyen to enter the matrix.
Project Status:
Wings: 12.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~114 hours
Tuesday, January 02, 2007
Next is the slat placement template. I need to stop by the metal shop in the morning to get some aluminum plate ( t=.125, 80mm x 150mm )
There are some things the every good workshop should have... like an iPod. Seriously, having every CD you own in something in the equivalent volume of a CD case is perfect for keeping in the shop.
In other good news: http://www.can-zacaviation.com/floats/floats.htm
Project Status:
Wings: 11.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~113 hours
Monday, January 01, 2007
The left tip ribs took about 1/4 of the time compared to the right wing, and I can only imagine how much faster the rear ribs will be.
Project Status:
Wings: 10h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~111.5 hours
Project Status:
Wings: 9h ( 1h, 1h, 0.5h, 2.5h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~110.5 hours