We spent only an hour today, but managed to get the tip ribs drilled into place for the left wing. A friend was over helping with the build, so all the tools that are normally taken for granted become cool and new again.
The left tip ribs took about 1/4 of the time compared to the right wing, and I can only imagine how much faster the rear ribs will be.
Project Status:
Wings: 10h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~111.5 hours