New Years Eve: About four hours were spent on the right wing. The rear ribs were drilled into place, along with the root rib. The spar tip extension was drilled into place. The slat brackets were predrilled. We also bought a new work light and some extrusion for the slat placement template. I could not find any t=.125 plates at the Home Depot, so I bought some thinner plate that will just be layered.
Project Status:
Wings: 9h ( 1h, 1h, 0.5h, 2.5h, 4h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~110.5 hours