I finally found some energy to get back into the garage. It took about two hours to get the rear bottom skins drilled into place. The biggest time sinks were having to cleco myself and reclaiming silver clecos. It is hard to imagine that we are low on A3 clecos again, but we are. To get clecos back I drilled some holes out to A4s.
When you are placing your holes for the outboard side of the flaperon brackets the manual states that the hole is 10mm from the bracket, but there is a better way of finding the hole. Simply extend your rivet line from the ribs down to the rear channel. Drill where the two lines intersect.
Project Status:
Wings: ~91h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~194.5 hours
No comments:
Post a Comment