Thursday, June 29, 2006

The first milestone of the garage was reached. After 1.5 hours of work the brackets were drilled into the correct position, cut as required and deburred. The existing skeleton was checked for burrs and then riveted. The skin was measured and positioned. The next task will be to skin the stab and then move on to the elevator.






Project Status:
Horizontal Stabilizer: 16 hours spent, 3 pieces borked ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h )
Rudder Done, minus horn : ~16 hours spent, ( ~8h, ~8h )
Workshop Done: ~8 hours