Wednesday, November 07, 2007

Tuesday I received the controls subkit, but I have not yet taken inventory. Instead I worked for three hours on the floor skins. The floor skins are drilled together along with the channel that the main gear suspension sits in.

To get around having to use an angle drill on the channel doublers I pre-drilled the doubler plates, then drilled them into the channel on the outside. Since I was careful about drilling straight into the metal I was able to then cleco them inside the channel in their proper position.

I accidentally pre-drilled the aft floor skin ( 7F8-8 ) without realizing the best way was to pre-drill the channel ( 7F10-1 ). Since the channel sits on top of the skin, I was looking at a situation where the skin would have to ride up the radius to drill into the correct position. Instead I was able to keep everything aligned and just flipped over the skins and channel. This way I was able to use the web to verify the correct position of the skin. Using a square and my 48" level I was able to verify that everything was centered.

PROGRESS:
Fuselage ~76h ( 3h, 3h, 2h, 3h, 7h, 2h, 5h, 2h, 3h, 2h, 2h, 3h, 6h, 2h, 2h, 1.5h, 2.5h, 1h, 2h, 3h, 2h, 3h, 4h, 1h, 2h, 1h, 3h, 4h, 3h)
Wings: ~157.5h ( 1h, 1h, 0.5h, 2.5h, 4h, 1h, 1.5h, 1h, 1.5, 4.5, 1h, 1h, 2h, 4h, 1h, 3h, 1h, 2h, .5h, 1.5h, 2h, 2h, 2h, .5h, 1h, .5h, .5h, 2h,3h, 1h, 3h, 3h, 4h, 2h, 3h, 7h, 3h, 1h, 4h, 1h, 1h, 1h, 4h, 2h, 2h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 3h, 2h, 2h, 1h, 2h, 3h, 2h, 1h, 1h, 1.5, 2h, 2h, 3h, 2h, 1h, 3h, 2h, 1h, 2h, 1h, 5h, 2h, 1h, 2h, 4h, 2h )
Flaperons: ( DONE! ) 23.5 hours spent ( 3h, 1h, 1h, 1h, 1.5h, 3h, 6h, 3h, 4h, 1h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~338h