Wednesday, August 30, 2006
Tuesday, August 29, 2006
The entire trip was done over two days. The first day was 4.8 hours and went from Seattle to Portland, fuel in McMinnville, over Eugene, attempted landing at Oakridge and the back to Eugene.
The return was 3.8 hours and was from Eugene, fuel in McMinnville, over Portland and then to Seattle.
Enough good things can not be said about the Garmin 496... especially the XM radio part. Listening to some music on the long legs really helped. The PMA audio panel would automagicaly mute the input audio when talking or receiving transmission. There are a few things that would change about the unit, but a full reviewing post will come later.
Wednesday, August 23, 2006
Just for fun:
Hiatus:
Etymology
Derives from Latin “hiatus”, -us, m.: gap; cf. hiare, hio, hiavi (hisco); (χαίνω) έ-χαν-ον, κέχηνα; Old High German ginēn; German 'gähnen' -> "yawn")
Pronunciation
- Audio (US)?, file
- Rhymes: -eɪtəs
Noun
hiatus (plural hiatus or hiatuses)
Singular | Plural |
- A break or pause.
- A gap in a series, making it incomplete.
- (linguistics)
- A syllable break between two vowels, without an intervening consonant. (Compare diphthong.)
- The condition of having such a break.
- Words like reality and naïve contain vowels in hiatus.
- A gap in geological strata.
- A fissure in a bone.
- A small difference in pitch between two musical tones.
- A vacation.
Synonyms
- break (1)
Sunday, August 20, 2006
We will be making the flaperons first. I went ahead and cut the 26mm angle off the mounting brackets and pre-drilled the holes into the brackets per the plans.
About one hour was spent on the inventory, and another 1.5 hours spent cutting those angles.
Project Status:
Flaperons: 1.5 hours spent ( 1.5h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~80 hours
Thursday, August 17, 2006
The blog was upgraded to the new beta version of Blogger today. If anyone has problems with the page let me know via email or comments.
Upgrading allowed a massive cleanup to the HTML/CSS code template that I had heavily modified. The new system also allows for much easier addition, movement, editing and subtraction of the embeded HTML in the sidebar.
Posts also now can get tagged with a few words that describe the nature of the post like "blog", "vacation", "construction tip", ect. This should make it easier for people to filter out stuff that isn't directly construction related. In addition, the archives widget is now more useful.
The layout is going to get tweaked over the next several days. Please leave feedback about what you like and hate.
Wednesday, August 16, 2006
Last night my neighborhood had a block party. This was a belated event from the "Neighborhood Night Out" that happened on the 1rst.
My place is on a small block in the NE corner of Ballard. It's fairly quite with many long time residents. Well as the new people, we were asked which house was ours. My response was normally something like "The house with all the strange construction noises". Based on the AOPA, EAA, SPA, and BFI stickers many had already figured out that I was a pilot, but hadn't realized what the noise was.
I got the normal questions and responses like: "Like a remote controlled plane?", "That's legal?", "How will you fit it in your garage?", and so on. In the end about 15 neighbors ( at once ) ended up in my garage to see the project. I tried to answers everyone's questions about the tools, materials and inspection process.
In the end a number of people expressed interest in flying and in experimental aviation. Hopefully more people will pop their heads into the garage.
It was a good experience, especially since I missed the Eastside EAA meeting.
Monday, August 14, 2006
I heard back from Zenith builder support today. For some reason my hinge hole is closer to the gusset bracket than it should be. I measured exactly 135mm from the center hinge bracket flange end, but I didn't verify the measurments of the gusset. According to Caleb the factory demo plane has 11mm from 7H5-3 to the edge of 7H5-4. So I'll trim about 10mm from the gusset and perhaps add a doubler to the gusset. Also according to Caleb, trimming the gusset is not an abnormal step to take to allow full motion.
It also turns out that you need to drill the holes for the cotter pins on the outboard hinge pins. I'll have to drill out the rivets ( getting those out of the elevator will be a pain! ) and then conscript a drill press to make a 1/16th" hole.
Saturday, August 12, 2006
The empennage is riveted. A few small questions still remain. First the hinge pins do not seem to have holes for the cotter pins. The second question is about which side the center hinge bracket goes in relation to 7H5-3 ( horn angle ). If the bracket is on the outside then the upward elevator motion is interrupted by 7H5-4 ( center hinge gusset ). If the bracket is moved to the inside then the elevator is slightly out of position and more of the center elevator hinge will have to be removed to achieve full movement.
In total I spent about six hours working on the plane and another hour playing with Sketchup and the paint job.
Of course this photo was taken at the end of the six hours... and at about 11pm.
Next up flaperons!
Project Status:
Paint Design: 2 hour spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~78.5 hours
Friday, August 11, 2006
I took delivery of the flaperon / slats kit on Wednesday. The crate is still closed and an inventory has not been taken. While waiting for the crate I worked on the hinges for about an hour and cleaned up the garage to make room for the new crate.
When I skinned the elevator I went ahead and drilled the elevator channels not realizing that the horn brackets would go there. When it came time to put the horn brackets on I needed to drill out a few rivets and fit the brackets through the existing holes. That worked for the bottom, but for all four brackets to join nicely I had to drill new holes into the spar. One of the holes was a little close to the new hole, so I fashioned a "patch" that goes over the the previous holes and restores any strength that may have been lost without affecting the fit of the horn brackets.
Initially I thought I borked the newly received center hinge by drilling the hinge hole too early. I had measured the 135mm from the bracket flange tip up the centerline. When I did a quick test fit against the bracket it attaches too I freaked out when the hinge hit against the elevator spar and was at least 1/4" away from the desired hole.. After calming down a little I realized what needed to be done was the following procedure: I clecoed the center hinge to the bracket on the outside of the flange and rotated the brackets. While rotating I used a Sharpie to determine the area that needed to be ground away. After fifteen minutes of using the rasp I had the correct fit.
The next step is to deal with the outside hinges and make sure everything is co-linear. Yeah.
I hope to have a completed tail section on Saturday with the flaperons starting on Sunday.
Google Sketchup is a cool tool I've used in the past. When we moved I spent a few hours with it and made a mockup of our new dwelling along with the major furniture with real measurements. This worked better than the old graph paper alternative because the digital objects gave a better sense of volume. I'm taking the same approach to designing my paint scheme. I spent about an hour making a digital elevator and horizontal stabilizer. The next step is to create a texture to be applied over the base "paint". The paint scheme I have in my head is fairly grand. Spending at least 400 hours on construction and then not taking that extra step to make my plane stand out is inconceivable to me. I want to make sure that the paint job looks good from several conceivable angles and translates well.
Project Status:
Paint Design: 1 hour spent ( 1h )
Elevator: ~25.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h )
Horizontal Stabilizer: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder Done, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~71.5 hours
Sunday, August 06, 2006
Luckily there was some scrap aluminum to make the cable template out of.
The next steps are the side brackets, the mating of the elevator and stabilizer and the final riveting.
Saturday was spent getting my night currency back. The last time I logged night hours was November 2005. While I was practicing fireworks were being shot from Lake Washington in celebration of Seafair. The explosions were probably just a little over two miles away, and at about the same altitude.
Project Status:
Elevator: ~24.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h )
Horizontal Stabilizer: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder Done, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~69.5 hours
Saturday, August 05, 2006
The part came with a few lines on it, so I'm guessing Zenith did a little extra quality assurance on this one.
The Matronic's list has been hopping with talk about Zenith and customer care. Currently I have yet to have any bad experiences with them, and the fact that a new part was on it's way a day after I talked to Caleb really shows how committed they are to supporting the product.
Friday, August 04, 2006
Zenith called and told me that slats and flaperons are on the way. A few days ago I printed out the flaperon construction manual and became worried that I should have built the wing first. It turns out that building the flaperons first is possible. Caleb gave me advise and I can procede as intended.
I'm still waiting on the replacement hinge bracket, and I'm guessing that it will arrive after the slats. Oh well.
Work is getting crunchy so finding time to build durring 12+ hour work days is getting harder.
Seafair is this weekend, so I'll be on high alert and pay attention to TFRs. The last thing I want is to get shot down BY a Blue Angel.
Bogey's air speed not sufficient for intercept. Suggest we get out and walk.