Sunday, August 20, 2006

After a small break we took a final inventory of all the parts in the latest shipment from Zenith. Immediately I was struck by how heavy the skins are for the flaperons and the slats. The skins for the flaperons seems to be almost as heavy as the elevator and the stabilizer combined!

We will be making the flaperons first. I went ahead and cut the 26mm angle off the mounting brackets and pre-drilled the holes into the brackets per the plans.

About one hour was spent on the inventory, and another 1.5 hours spent cutting those angles.

Project Status:
Flaperons: 1.5 hours spent ( 1.5h )
Paint Design: 2 hours spent ( 1h, 1h )
Elevator DONE!: ~31.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h, 1h, 6h )
Horizontal Stabilizer DONE!: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder DONE!, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~80 hours