I spent a total of 4.5 hours getting the elevator horns drilled along with the center hinge bracket. The new Zenith bracket was the right size!
Luckily there was some scrap aluminum to make the cable template out of.
The next steps are the side brackets, the mating of the elevator and stabilizer and the final riveting.
Saturday was spent getting my night currency back. The last time I logged night hours was November 2005. While I was practicing fireworks were being shot from Lake Washington in celebration of Seafair. The explosions were probably just a little over two miles away, and at about the same altitude.
Project Status:
Elevator: ~24.5 hours spent ( 3h, 1.5h, 3h, .5h, 3.5h, 2h, 4h, 1.5h, 2h, 4.5h )
Horizontal Stabilizer: ~28 hours spent, 3 pieces replaced ( 3h, 2h, 2h, 2h, .5h, 1.5h, 3.5h, 1.5h, 5, 4.5, 2h, .5h )
Rudder Done, minus horn : ~16 hours spent, ( ~8h, ~8h )
-----------------------
Total Done: ~69.5 hours
No comments:
Post a Comment