Sunday, June 26, 2011

Tensioned elevator. Re-adjusted slack bungee, added nylon blocks where elevator cables could rub. Safety wired elevator turnbuckles. Removed elevator and adjusted bolts, installed & castelated elevator bolts.

Finalized rudder bolts.

Bolted battery into position.

Installed dataplate.

Greased all bushings, control bolts.

Aimed landing lights.

Punch List:
Tighten passenger door ( opened during run-up )
Have transponder tested by avionics shop
FINISH PROCEDURES\MANUAL
VGs on elevator
nuetralize aileron rods & control
Shorten steering pushrods, instal plates to lengthen rudder cable.
Final securing of wires after of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
fabricate, install streamlined strut covers. ( post first-flight )
Correct tach reading on Dynon, reconnect hobbs meter.