Monday, June 27, 2011

Had a project visit and identified a few more minor changes.

Lost the elevator trim servo cover ( held on by clecos ) during a runup test.

Torqued more bolts to final, riveted flaperon covers into place. Touched up primer on a few steel parts.

Fixed tachometer reading on Dynon. Tied down more wire bundles.

Punch List:
Fabricate wire bundle supports for rear cargo area.
Fabricate new elevator servo cover.
Have transponder tested by avionics shop
FINISH PROCEDURES\MANUAL
VGs on elevator
nuetralize aileron rods & control
Shorten steering pushrods, instal plates to lengthen rudder cable.
Final securing of wires aft of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
fabricate, install streamlined strut covers. ( post first-flight )

Sunday, June 26, 2011

Tensioned elevator. Re-adjusted slack bungee, added nylon blocks where elevator cables could rub. Safety wired elevator turnbuckles. Removed elevator and adjusted bolts, installed & castelated elevator bolts.

Finalized rudder bolts.

Bolted battery into position.

Installed dataplate.

Greased all bushings, control bolts.

Aimed landing lights.

Punch List:
Tighten passenger door ( opened during run-up )
Have transponder tested by avionics shop
FINISH PROCEDURES\MANUAL
VGs on elevator
nuetralize aileron rods & control
Shorten steering pushrods, instal plates to lengthen rudder cable.
Final securing of wires after of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
fabricate, install streamlined strut covers. ( post first-flight )
Correct tach reading on Dynon, reconnect hobbs meter.

Saturday, June 18, 2011


Re-weighed the plane.
Nose: 162lb, arm=670mm
Left main: 232, arm= = 690mm
Right main: 232, arm = 670mm

Added RTV seal & trim around fuel neck filler & wing skin. Tightened a few more bolts & added cotter pins to all but two steering & rudder nuts. Added fuel type markings.

Tightened bolts between steering push rods and nose strut along with jam nuts.

Found fuel senders were "double grounded" and pins were crossed. Fixed fuel sender wiring. Flushed fuel system and calibrated Dynon fuel sensors.

Bled brake lines.

Charged battery.

Started engine from fuel in wing tanks.

Taxied under own power across the airport. Started break-in procedure for Matco brakes. Verified steering and brakes.

Punch List:
FINISH PROCEDURES\MANUAL
Final placement of battery
Install EAB plaque
VGs on elevator
nuetralize aileron rods & control
Final securing of wires after of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
fabricate, install streamlined strut covers. ( post first-flight )
Install steering boots
Install nylon strip in service hatch to protect against elevator cable rub
Remove elevator & grind down clearance of center hinge.
Correct tach reading on Dynon, reconnect hobbs meter.
Aim, secure landing lights

Wednesday, June 15, 2011

Did a bolt\torque check. Identified all untighted and overtorqued bolts. Replaced all severly overtorque bolts. 95% of all exterior bolts now flight ready. Almost all cotter pins installed, all others marked. Removed the dorsal fin. trimmed the top fuselage skin at the elevator cable exit and moved the reinforcement bulkhead forward to account for the bungee tension.

Ordered some nylon to mitigate rubbing of the elevator cable on the baggage compartment.

Gave the EAB plaque to the engraver. Worked on procedures and manual.

Took an initial weight measurement of 621 pounds.

Punch List:
FINISH PROCEDURES\MANUAL
W&B
Final placement of battery ( pending W&B )
Install EAB plaque
Fuel Filler Marking for 10G 92MoGas\100LL w/TCP
Post registration in cabin
bleed brake lines
VGs on elevator
nuetralize aileron rods & control
Fuel tank calibration
Final securing of wires after of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
Torque seal push rod jam nuts.
fabricate, install streamlined strut covers. ( post first-flight )
Install steering boots
Install nylon strip in service hatch to protect against elevator cable rub

Wednesday, June 08, 2011



Finished transition training. Adjusted elevator tension bungee. Trimmed wingroot covers, ready for rivetting once fuel system is fully tested. Installed fire extinguisher. Added extra nutplates for cowling. Epoxied NACA inlet adapter for oilcooler. Fitted washers for bellcranks. Created steering boots.

Trimmed, primed and installed dorsal fins. Bunch of small stuff.

Punch List:
FINISH PROCEDURES\MANUAL
W&B
Final placement of battery ( pending W&B )
Engrave & install EAB plaque
Fuel Filler Marking for 10G 92MoGas\100LL w/TCP
Post registration in cabin
bleed brake lines
VGs on elevator
nuetralize aileron rods & control
Fuel tank calibration
Final securing of wires after of seats in luggage
More cotter pins & safety wire
Safety wire turnbuckles in "double wrap" style
Torque seal push rod jam nuts.
fabricate, install streamlined strut covers. ( post first-flight )
Install steering boots
Install nylon strip in service hatch to protect against elevator cable rub