Monday, March 08, 2010

Thanks to a team of really great friends, the project is now in at an airport.

I have worked up a punch list of the stuff that needs to be done before the first flight, but engine start should be before the end of March.


  • Finalize access hatch

  • Replace bad rivets

  • Finish securing wires

  • Buy Oddessy battery

  • Run battery cables

  • Ammeter shunt

  • Battery charging

  • Starter

  • Mags

  • safety wire

  • cotter pins

  • More AN3-4As

  • Brake lines/line clips

  • Rudder pedals

  • Attach wings

  • Elevator bungee

  • Elevator cables

  • Rudder cables

  • Paint

  • Seal windshield, sunroof

  • Attach slats

  • Attach flaperons

  • Slat push rod covers

  • Trim doors

  • Fill door tubes

  • Upholstry

  • Sound deading material

  • Fuel lines/firesleeving

  • Carb heat kit

  • Strobe/position final run

  • Pitot/AOA tube

  • Rivet wingtips

  • Wing root covers

  • Vinyl decals

  • Data plate

  • Install elevator trim motor to elevator

No comments: