I have worked up a punch list of the stuff that needs to be done before the first flight, but engine start should be before the end of March.
- Finalize access hatch
- Replace bad rivets
- Finish securing wires
- Buy Oddessy battery
- Run battery cables
- Ammeter shunt
- Battery charging
- Starter
- Mags
- safety wire
- cotter pins
- More AN3-4As
- Brake lines/line clips
- Rudder pedals
- Attach wings
- Elevator bungee
- Elevator cables
- Rudder cables
- Paint
- Seal windshield, sunroof
- Attach slats
- Attach flaperons
- Slat push rod covers
- Trim doors
- Fill door tubes
- Upholstry
- Sound deading material
- Fuel lines/firesleeving
- Carb heat kit
- Strobe/position final run
- Pitot/AOA tube
- Rivet wingtips
- Wing root covers
- Vinyl decals
- Data plate
- Install elevator trim motor to elevator